Project Completion Certificate (Ground Water)
Scheme ID: 20095866 Name of Scheme: KHEOKHARI&BEYOTI No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2910 Base Year: 2023 Intermediate Year: 2033 Design Year: 2058
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 21 M / 79.40 m KHOKHARI BEYOTI 25°.6889672 N 81.0186156 "E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 60 M KHOKHARI BEYOTI 25°.6889672 N 81.0186156 "E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 14 M KHOKHARI BEYOTI 25°.6889672 N 81.0186156 "E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K,9 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 .076
2 HDPE 160 0.084
3 HDPE 140 0.728
4 HDPE 125 0.082
5 HDPE 110 .1
6 HDPE 90 .8711
7 HDPE 75 .8489
8 HDPE 63 7.7819
HSC Connection
Sno. Total Nos.
1 561
Other Details
2.76
0.00
2.51
29-Apr-2025
30-Apr-2026