| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20095866 | Name of Scheme: KHEOKHARI&BEYOTI | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2910 | Base Year: 2023 | Intermediate Year: 2033 | Design Year: 2058 |
| Date of Completion (As per Contract): 14-May-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 21 M / 79.40 m | KHOKHARI BEYOTI | 25°.6889672 N | 81.0186156 "E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 600 LPM / 60 M | KHOKHARI BEYOTI | 25°.6889672 N | 81.0186156 "E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 KL / 14 M | KHOKHARI BEYOTI | 25°.6889672 N | 81.0186156 "E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K,9 | 100 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | .076 | |
| 2 | HDPE | 160 | 0.084 | |
| 3 | HDPE | 140 | 0.728 | |
| 4 | HDPE | 125 | 0.082 | |
| 5 | HDPE | 110 | .1 | |
| 6 | HDPE | 90 | .8711 | |
| 7 | HDPE | 75 | .8489 | |
| 8 | HDPE | 63 | 7.7819 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 561 |