Scheme ID: 20095909 Name of Scheme: SANGRAMPUR,BHAKRANA No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 4670 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 15-May-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/119.40 SANGRAMPUR 25".75991338 81.0323922
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400/60 SANGRAMPUR 25".75991338 81.0323922
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M SANGRAMPUR 25".75991338 81.0323922
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 10.1
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.244
2 HDPE 180 0.641
3 HDPE 160 0.280
4 HDPE 140 0.382
5 HDPE 125 0.604
6 HDPE 110 0.387
7 HDPE 90 1.168
8 HDPE 75 1.1671
9 HDPE 63 11.2495
HSC Connection
Sno. Total Nos.
1 916
Other Details