Project Completion Certificate (Ground Water)
Scheme ID: 20095915 Name of Scheme: SEMARI No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3840 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 30-Jun-0020
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 14 M / 125.85 m SEMARI 25°.8241432"N 80.9058616"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 400LPM / 60 M SEMARI 25°.8241432"N 80.9058616"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 150 KL / 20 M SEMARI 25°.8241432"N 80.9058616"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 80 0.02645
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 1.908
2 HDPE 180 0.2313
3 HDPE 160 2.3356
4 HDPE 140 1.502
5 HDPE 110 1.894
6 HDPE 90 1.028
7 HDPE 75 3.57
8 HDPE 63 7.656
HSC Connection
Sno. Total Nos.
1 1107
Other Details
3.51
0.00
3.58
11-Nov-2024
12-Nov-2024