| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20095919 | Name of Scheme: SIHARI PATTI | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2330 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Aug-2023 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 1 | 132 | SIHARI PATTI | 25.56751500 | 81.172095 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 1 | 55M/12.5 BHP | SIHARI PATTI | 25.56771500 | 81.172095 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | 1 | 150KL/12M | SIHARI PATTI | 25.56741500 | 81.172095 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-9 | 100 | 0.0291 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 125 | 1.7970 | |
| 2 | HDPE PIPE | 110 | 0.0645 | |
| 3 | HDPE PIPE | 90 | 0.9017 | |
| 4 | HDPE PIPE | 75 | 1.5375 | |
| 5 | HDPE PIPE | 63 | 3.7159 | |
| 6 | HDPE PIPE | 160 | 1.137 | |
| 7 | HDPE PIPE | 160 | 1.137 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 489 |