Project Completion Certificate (Ground Water)
Scheme ID: 20096161 Name of Scheme: NAUSANDA Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 9
Total Population Covered: 5050 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 16-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 30/71.33 NAUSANDA 26.550978 82.542448
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 20 hp 1.1/46 NAUSANDA 26.550978 82.542448
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 300KL/16M NAUSANDA 26.550978 82.542448
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 4.208
2 HDPE Pipe PN-6: Class PE-100 75 2.577
3 HDPE Pipe PN-6: Class PE-100 63 23.140
4 HDPE Pipe PN-6: Class PE-100 110 0.170
5 HDPE Pipe PN-6: Class PE-100 125 1.140
6 HDPE Pipe PN-6: Class PE-100 140 1.093
7 HDPE Pipe PN-6: Class PE-100 160 0.645
8 HDPE Pipe PN-6: Class PE-100 180 0.514
9 HDPE Pipe PN-6: Class PE-100 200 0.290
HSC Connection
Sno. Total Nos.
1 794
Other Details
3.97
3.97
3.95
16-Oct-2025
17-Oct-2025