Project Completion Certificate (Ground Water)
Scheme ID: 20096162 Name of Scheme: CHISTIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 1147 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Jan-2025 Actual Date of Completion (Capex): 20-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain pipe 150mm dia 30 TW 26.027284 83.542890
2 Slotted pipe 150mm dia 18 TW 26.027284 83.542890
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 270LPM/42 TW 26.027284 83.542890
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zincalume tank 75/12 OHT 26.027284 83.542890
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 80 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 2.32
2 HDPE PN6 PE100 75 0.274
3 HDPE PN6 PE100 90 0.518
4 HDPE PN6 PE100 110 0.708
5 HDPE PN6 PE100 125 0.119
6 HDPE PN6 PE100 140 0.219
7 HDPE PN6 PE100 160 0.286
8 HDPE PN6 PE100 180 0.0375
HSC Connection
Sno. Total Nos.
Other Details
1.31
0.00
1.33
19-Jan-2025
20-Jan-2025