| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20096363 | Name of Scheme: SAKURPUR VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4120 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 09-Feb-2022 | Actual Date of Completion (Capex): 30-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24/90 | shakurpur | 28.84553333 | 77.63654 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 550/55 | shakurpur | 28.84553333 | 77.6354 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | shakurpur | 28.84553333 | 77.6354 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | 0.0185 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.789 | |
| 2 | HDPE | 75 | .1627 | |
| 3 | HDPE | 90 | .1717 | |
| 4 | HDPE | 140 | .2613 | |
| 5 | HDPE | 160 | .4124 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 485 |