Project Completion Certificate (Ground Water)
Scheme ID: 20096865 Name of Scheme: Bibapur No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1845 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Mar-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 15.09/100.55 Bibapur 26.335456 79.801125
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 24/69 Bibapur 26.335456 79.801125
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/16 Bibapur 26.335456 79.801125
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.020 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.20 As per Site
2 HDPE 75 0.160 As per Site
3 HDPE 90 0.736 As per Site
4 HDPE 110 1.95 As per Site
5 HDPE 140 0.532 As per Site
HSC Connection
Sno. Total Nos.
Other Details
1.54
2.04
2.04
05-Dec-2023
06-Dec-2023