| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20096900 | Name of Scheme: GANGAPUR MU RAMAIPUR WSS | No. of Villages: 4 | No. of Habitation Covered: 12 |
| Total Population Covered: 1530 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Mar-2024 | Actual Date of Completion (Capex): 28-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.05/85.75 | GANGAPUR | 26.4850014 | 82.0657392 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP | 330/40 | GANGAPUR | 26.4850014 | 82.0657392 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | GANGAPUR | 26.4850014 | 82.0657392 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | 0.0184 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6:CLASS PE-100 | 200 | 0 | |
| 2 | HDPE PIPE PN-6:CLASS PE-100 | 180 | 0 | |
| 3 | HDPE PIPE PN-6:CLASS PE-100 | 160 | 0 | |
| 4 | HDPE PIPE PN-6:CLASS PE-100 | 140 | 0.614 | |
| 5 | HDPE PIPE PN-6:CLASS PE-100 | 125 | 0 | |
| 6 | HDPE PIPE PN-6:CLASS PE-100 | 110 | 0.473 | |
| 7 | HDPE PIPE PN-6:CLASS PE-100 | 90 | 0.523 | |
| 8 | HDPE PIPE PN-6:CLASS PE-100 | 75 | 0.361 | |
| 9 | HDPE PIPE PN-6:CLASS PE-100 | 63 | 6.891 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 285 |