| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20096903 | Name of Scheme: KAKVA & BIYASIYA WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 22 |
| Total Population Covered: 5441 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Jan-2024 | Actual Date of Completion (Capex): 21-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL 1 | 14.7 / 54.8 | KAKVA & BIYASIYA | 26.105480 | 81.704250 |
| 2 | TUBEWELL 2 | 15.38 / 56.3 | KAKVA & BIYASIYA | 26.108735 | 81.704671 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE 1 | 565 LPM / 56 M | KAKVA & BIYASIYA | 26.105480 | 81.704250 |
| 2 | SUBMERSIBLE 2 | 565 LPM / 56 M | KAKVA & BIYASIYA | 26.108735 | 81.704671 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 325 KL / 18 M | KAKVA & BIYASIYA | 26.105480 | 81.704250 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 17.117 | |
| 2 | HDPE | 90 | 9.232 | |
| 3 | HDPE | 110 | 2.668 | |
| 4 | HDPE | 125 | 0.612 | |
| 5 | HDPE | 140 | 0.439 | |
| 6 | HDPE | 160 | 0.940 | |
| 7 | HDPE | 180 | 0.464 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 959 |