Project Completion Certificate (Ground Water)
Scheme ID: 20097003 Name of Scheme: Sheh Village WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3476 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-May-2025 Actual Date of Completion (Capex): 10-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16/131 Sheh 29.059482 78.437171
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submerssible Pump 7.5 HP 580/47 Sheh 29.059482 78.437171
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/14 Sheh 29.059482 78.437171
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D I K-7 Pipe 125 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, PE-100 63 4.41
2 HDPE Pipe PN-6, PE-100 75 0.63
3 HDPE Pipe PN-6, PE-100 90 0.31
4 HDPE Pipe PN-6, PE-100 110 0.051
5 HDPE Pipe PN-6, PE-100 140 0.06
6 HDPE Pipe PN-6, PE-100 160 0.62
HSC Connection
Sno. Total Nos.
1 410
Other Details
1.76
1.76
1.76
19-Dec-2024
20-Dec-2024