| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097153 | Name of Scheme: Thakurpur no-2 water supply sysytem | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 3060 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 21-Apr-2024 | Actual Date of Completion (Capex): 12-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18/116.32 | Thakurprur No-02 | 26.8865 | 83.3702 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 39/43 | Thakurprur No-02 | 26.8865 | 83.3702 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 | 175/16 | Thakurprur No-02 | 26.8865 | 83.3702 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 14.653 | Laying Completed |
| 2 | HDPE | 75 | 0.280 | Laying Completed |
| 3 | HDPE | 110 | 0.404 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 524 |