Project Completion Certificate (Ground Water)
Scheme ID: 20097174 Name of Scheme: Nabipur Water Supply System No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2670 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Oct-2024 Actual Date of Completion (Capex): 31-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/110.88 Nabipur 26.8414 83.4931
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33/41 Nabipur 26.8414 83.4931
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/14 Nabipur 26.8414 83.4931
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.005 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.094 Laying Completed
2 HDPE 75 1.124 Laying Completed
3 HDPE 90 0.788 Laying Completed
4 HDPE 110 0.737 Laying Completed
HSC Connection
Sno. Total Nos.
Other Details
1.83
0.00
1.82
31-Mar-2026
01-Apr-2026