Project Completion Certificate (Ground Water)
Scheme ID: 20097194 Name of Scheme: Tenuwa Water Supply System No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3700 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Apr-2025 Actual Date of Completion (Capex): 06-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/116.86 Tenuwa 26.7214 83.2350
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 48/43 Tenuwa 26.7214 83.2350
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 225/14 Tenuwa 26.7214 83.2350
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.030 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.643 Laying Completed
2 HDPE 110 0.336 Laying Completed
3 HDPE 140 1.487 Laying Completed
HSC Connection
Sno. Total Nos.
1 604
Other Details
2.04
0.00
2.07
05-Mar-2025
06-May-2025