Project Completion Certificate (Ground Water)
Scheme ID: 20097196 Name of Scheme: Jungle Rasoolpur No-1 Water Supply System No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1590 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Apr-2023 Actual Date of Completion (Capex): 17-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12.04 Jungle Rasoolpur No-01 26.6220 83.5738
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 21/41 Jungle Rasoolpur No-01 26.6220 83.5738
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/14 Jungle Rasoolpur No-01 26.6221 83.5738
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.987 Laying Completed
2 HDPE 75 0.118 Laying Completed
3 HDPE 90 0.092 Laying Completed
HSC Connection
Sno. Total Nos.
Other Details
1.50
0.00
1.48
16-Jul-2024
11-Dec-2024