Scheme ID: 20097226 Name of Scheme: Kala Kheri Village WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2684 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Mar-2026 Actual Date of Completion (Capex): 01-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.009
2 K-7 DI PIPE 200 0.004
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 4.43
2 HDPE PIPE PN -6: CLASS PE -100 75 0.46
3 HDPE PIPE PN -6: CLASS PE -100 90 0.40
4 HDPE PIPE PN -6: CLASS PE -100 110 0.49
5 HDPE PIPE PN -6: CLASS PE -100 140 0.08
6 HDPE PIPE PN -6: CLASS PE -100 160 0.08
7 HDPE PIPE PN -6: CLASS PE -100 200 0.22
HSC Connection
Sno. Total Nos.
1 610
Other Details
1.94
1.94
1.80
31-Mar-2026
01-Apr-2026