Project Completion Certificate (Ground Water)
Scheme ID: 20097275 Name of Scheme: PANDLI SVS (S) No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1820 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Sep-2024 Actual Date of Completion (Capex): 30-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22.02 Mtr/ 107.19 M Pandli 28.352373 78.25455
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 22.8 cum / 44 M Pandli 28.352373 78.25455
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 100 KL/ 12 M Pandli 28.352373 78.25455
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.03898
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.3712
2 HDPE Pipe PN-6: Class PE-100 75 0.471
3 HDPE Pipe PN-6: Class PE-100 63 3.8223
4 HDPE Pipe PN-6: Class PE-100 110 0.1097
5 HDPE Pipe PN-6: Class PE-100 140 0.1414
HSC Connection
Sno. Total Nos.
Other Details
1.53
1.30
1.30
31-Jul-2024
01-Aug-2024