Project Completion Certificate (Ground Water)
Scheme ID: 20097449 Name of Scheme: AHINDA No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1950 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Mar-2025 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/132 AHINDA 25°.9470016" N 81.05691833"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 420/55 AHINDA 25°.9470016" N 81.05691833"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/12 AHINDA 25°.9470016" N 81.05691833"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K,9 80 0.01630
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 140 0.0653
2 HDPE 125 0.1829
3 HDPE 110 0.0903
4 HDPE 90 0.0947
5 HDPE 75 1.2397
6 HDPE 63 4.4309
HSC Connection
Sno. Total Nos.
1 340
Other Details
0.00
0.00
0.00
07-Dec-2024
08-Dec-2024