| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097451 | Name of Scheme: BARANPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2360 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 19-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 480 LPM" | 19 M / 137.24 M | Baranpur | 25.871877 | 80.794756 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP Submersible Pump | 480 LPM / 55 M | Baranpur | 25.871877 | 80.794756 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 150 KL / 12 M | Baranpur | 25.872142 | 80.795686 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 100 | 0.0110 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6, PE-100 | 140 | 0.4128 | |
| 2 | HDPE PN-6, PE-100 | 110 | 0.7453 | |
| 3 | HDPE PN-6, PE-100 | 90 | 2.2696 | |
| 4 | HDPE PN-6, PE-100 | 75 | 1.7861 | |
| 5 | HDPE PN-6, PE-100 | 63 | 2.3573 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 571 |