Project Completion Certificate (Ground Water)
Scheme ID: 20097451 Name of Scheme: BARANPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2360 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 19-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 480 LPM" 19 M / 137.24 M Baranpur 25.871877 80.794756
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 480 LPM / 55 M Baranpur 25.871877 80.794756
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 150 KL / 12 M Baranpur 25.872142 80.795686
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 0.0110
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6, PE-100 140 0.4128
2 HDPE PN-6, PE-100 110 0.7453
3 HDPE PN-6, PE-100 90 2.2696
4 HDPE PN-6, PE-100 75 1.7861
5 HDPE PN-6, PE-100 63 2.3573
HSC Connection
Sno. Total Nos.
1 571
Other Details
2.36
2.36
2.36
18-Jan-2025
19-Jan-2025