| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097453 | Name of Scheme: DEWARA | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1310 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 17 M / 123.55m | DEWARA | 25°.8174583" N | 81.2330253"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 300 LPM / 60 M | DEWARA | 25°.8174583" N | 81.2330253"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT.1 | 100 KL / 14 M | DEWARA | 25°.8174583" N | 81.2330253"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 100 | 0.01040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 160 | 0.026 | |
| 2 | HDPE | 140 | 0.061 | |
| 3 | HDPE | 125 | 0.108 | |
| 4 | HDPE | 110 | 0.3543 | |
| 5 | HDPE | 90 | 0.883 | |
| 6 | HDPE | 75 | 0.3885 | |
| 7 | HDPE | 63 | 3.1274 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 251 |