Project Completion Certificate (Ground Water)
Scheme ID: 20097455 Name of Scheme: EKDALA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2572 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 15-May-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 17 M / 104 M EXDALA 250.6317s1 N 81.038534"8
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 580 LPM / 55 M EKDALA 25".631751 N 81.038S34'E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL. / 12 M EKDALA 25..631751N 81.038534"8
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I K-9 125 0.018 0.018KM
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 0.0445
2 HDPE 140 0.0865
3 HDPE 125 0.0425
4 HDPE 110 0.248
5 HDPE 90 0.3188
6 HDPE 75 0.577
7 HDPE 63 7.834
HSC Connection
Sno. Total Nos.
1 91513
Other Details
2.20
0.00
2.15
18-Dec-2024
19-Dec-2024