| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097459 | Name of Scheme: GEDURI | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1880 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 02-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 390 LPM | 18 / 107.90 | Geduri | 25.781362 | 80.950647 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP Submersible Pump | 23.4 / 55 | Geduri | 25.781362 | 80.950647 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Service Reservoir | 125 / 12 | Geduri | 25.781607 | 80.950827 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.0224 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE. PN-6. PE-100 | 160 | 0.2018 | |
| 2 | HDPE PIPE. PN-6. PE-100 | 125 | 0.5517 | |
| 3 | HDPE PIPE. PN-6. PE-100 | 110 | 0.5484 | |
| 4 | HDPE PIPE. PN-6. PE-100 | 90 | 0.3275 | |
| 5 | HDPE PIPE. PN-6. PE-100 | 63 | 2.6161 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 395 |