Project Completion Certificate (Ground Water)
Scheme ID: 20097460 Name of Scheme: GHARWASIPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1820 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 14-Aug-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 16/66.35 GHARWASHIPUR 25°.55968499 N 81.137945"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 380/55 GHARWASHIPUR 25°.55968499 N 81.137945"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/12 GHARWASHIPUR 25°.55968499 N 81.137945"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 80 0.02330
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 180 0.06
2 HDPE 160 0.98
3 HDPE 140 0.1429
4 HDPE 125 0.271
5 HDPE 110 0.3117
6 HDPE 90 0.9591
7 HDPE 75 1.2074
8 HDPE 63 2.7899
HSC Connection
Sno. Total Nos.
1 401
Other Details
1.92
0.00
1.91
11-Nov-2024
12-Nov-2024