| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097475 | Name of Scheme: MAHESHPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 558 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Jun-2023 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 09/65.06 | MAHESHPUR | 25..6326795 | 81.0566633 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP | 800 LPM/60 HEAD | MAHESHPUR | 25.60062027 | 81.07630452 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 150 KL/12 METER | MAHESHPUR | 25.60062027 | 81.07630452 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 100 | 0.21 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 4.0837 | |
| 2 | HDPE PIPE | 75 | 0.3967 | |
| 3 | HDPE PIPE | 90 | 0.2490 | |
| 4 | HDPE PIPE | 110 | 0.1280 | |
| 5 | HDPE PIPE | 125 | 0.2855 | |
| 6 | HDPE PIPE | 180 | 0.0190 | |
| 7 | HDPE PIPE | 200 | 0.3590 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 450 |