| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097484 | Name of Scheme: TEUJA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2690 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Aug-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 12 M / 80.50 M | TEUJA | 25°.828567" N | 81.07864"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 530 LPM / 55 M | TEUJA | 25°.828567" N | 81.07864"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT.1 | 175KL / 12M | TEUJA | 25°.828567" N | 81.07864"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI. K-9 | 80 | 0.0289 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.024 | |
| 2 | HDPE | 160 | 0.2375 | |
| 3 | HDPE | 140 | 0.1794 | |
| 4 | HDPE | 110 | 0.091 | |
| 5 | HDPE | 90 | 1.0086 | |
| 6 | HDPE | 75 | 0.3448 | |
| 7 | HDPE | 63 | 5.851 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 624 |