Project Completion Certificate (Ground Water)
Scheme ID: 20097484 Name of Scheme: TEUJA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2690 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Aug-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 12 M / 80.50 M TEUJA 25°.828567" N 81.07864"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 530 LPM / 55 M TEUJA 25°.828567" N 81.07864"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 175KL / 12M TEUJA 25°.828567" N 81.07864"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI. K-9 80 0.0289
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.024
2 HDPE 160 0.2375
3 HDPE 140 0.1794
4 HDPE 110 0.091
5 HDPE 90 1.0086
6 HDPE 75 0.3448
7 HDPE 63 5.851
HSC Connection
Sno. Total Nos.
1 624
Other Details
1.95
0.00
1.99
12-Jan-2025
13-Jan-2025