Project Completion Certificate (Ground Water)
Scheme ID: 20097485 Name of Scheme: UMARA No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2360 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 15-May-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/140.95 UMARA 25.79684796 81.07854211
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600/55 UMARA 25.79684796 81.07854211
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/12 UMARA 25.79684796 81.07854211
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 125 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 1.026
2 HDPE 180 0.713
3 HDPE 160 0.0343
4 HDPE 110 0.1
5 HDPE 90 0.6799
6 HDPE 75 0.063
7 HDPE 63 7.2855
HSC Connection
Sno. Total Nos.
1 612
Other Details
2.75
0.00
2.75
08-Dec-2024
09-Dec-0004