Project Completion Certificate (Ground Water)
Scheme ID: 20097490 Name of Scheme: MISA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2420 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 24-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 470 LPM" 18 M / 136.2 M Misa 25.832758 80.931262
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 "12.5 HP Submersible Pump" 470 LPM / 55 M Misa 25.832758 80.931262
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 150 KL / 12 M Misa 25.832786 80.931287
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 0.01830
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 PE 100 160 0.7732
2 HDPE PN-6 PE 100 125 0.215
3 HDPE PN-6 PE 100 110 0.5749
4 HDPE PN-6 PE 100 90 896.6
5 HDPE PN-6 PE 100 75 1.452
6 HDPE PN-6 PE 100 63 1.4664
HSC Connection
Sno. Total Nos.
1 554
Other Details
2.10
2.10
2.10
23-Mar-2025
24-Mar-2025