Project Completion Certificate (Ground Water)
Scheme ID: 20097498 Name of Scheme: AND MAW No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1640 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 16-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 350 LPM" 18 M / 117.2 M And Maw 25.783272 80.825600
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 350 LPM / 55 M And Maw 25.783272 80.825600
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 100 KL / 12 M And Maw 25.783183 80.825888
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 0.0105
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6, PE-100 140 0.4105
2 HDPE PN-6, PE-100 125 0.364
3 HDPE PN-6, PE-100 110 0.4208
4 HDPE PN-6, PE-100 90 0.437
5 HDPE PN-6, PE-100 75 1.0172
6 HDPE PN-6, PE-100 63 1.6488
HSC Connection
Sno. Total Nos.
1 327
Other Details
1.82
1.82
1.82
15-Feb-2025
16-Feb-2025