Project Completion Certificate (Ground Water)
Scheme ID: 20097505 Name of Scheme: BAROUN No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2860 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-0024 Actual Date of Completion (Capex): 30-Jun-0025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Old Tube well 0 BAROUN 25'.7985167',N 80.8234189"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 570 LPM / 55 M BAROUN 25'.7985167',N 80.8234189"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 otd oHT-1 250 KL / 16 M BAROUN 25'.7985167',N 80.8234189"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K.9 150 0.0235
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 0.1
2 HDPE 140 0.3905
3 HDPE 125 0.6581
4 HDPE 110 1.2344
5 HDPE 90 2.0857
6 HDPE 75 0.9791
7 HDPE 63 2.4464
HSC Connection
Sno. Total Nos.
1 775
Other Details
1.84
0.00
1.81
23-Feb-2024
24-Apr-2025