| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097512 | Name of Scheme: DHARAMPUR SATO | No. of Villages: 1 | No. of Habitation Covered: 21 |
| Total Population Covered: 9380 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Oct-2024 | Actual Date of Completion (Capex): 05-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 750 LPM | 24 / 140.56 | Dharampur Sato | 25.77548 | 80.977683 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 750 LPM / 60 M | Dharampur Sato | 25.77548 | 80.977683 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 275 KL / 18 M | Dharampur Sato | 25.775138 | 80.977535 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.0291 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 200 | 3.050 | |
| 2 | HDPE Pipe | 180 | 1.092 | |
| 3 | HDPE Pipe | 160 | 2.792 | |
| 4 | HDPE Pipe | 140 | 6.896 | |
| 5 | HDPE Pipe | 125 | 1.892 | |
| 6 | HDPE Pipe | 110 | 0.831 | |
| 7 | HDPE Pipe | 90 | 8.675 | |
| 8 | HDPE Pipe | 75 | 7.810 | |
| 9 | HDPE Pipe | 63 | 9.477 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1626 |