| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097522 | Name of Scheme: MADAULI | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2213 | Base Year: 2023 | Intermediate Year: 2033 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Aug-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 17/84.59 | MANDAULI | 25".657701 | 80.952035 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 510/60 | MANDAULI | 25".657701 | 80.952035 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150/16 | MANDAULI | 25".657701 | 80.952035 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K,9 | 100 | 0.10 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 1.1965 | |
| 2 | HDPE | 180 | 0.719 | |
| 3 | HDPE | 125 | 0.468 | |
| 4 | HDPE | 110 | 0.206 | |
| 5 | HDPE | 90 | 0.291 | |
| 6 | HDPE | 75 | 1.196 | |
| 7 | HDPE | 63 | 3.8258 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 431 |