Project Completion Certificate (Ground Water)
Scheme ID: 20097523 Name of Scheme: MAHAWATPUR ASHAT No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2660 Base Year: 2023 Intermediate Year: 2033 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 17/75.50 Mahwatpur 25".637477 87.073417
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 630/60 Mahwatpur 25".637477 87.073417
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/14 Mahwatpur 25".637477 87.073417
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K,9 100 0.16
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.18
2 HDPE 180 0.263
3 HDPE 160 0.683
4 HDPE 125 0.132
5 HDPE 110 1.296
6 HDPE 90 0.258
7 HDPE 75 2.077
8 HDPE 63 4.493
HSC Connection
Sno. Total Nos.
1 550
Other Details
2.84
0.00
2.84
18-Apr-2025
19-Apr-2025