Project Completion Certificate (Ground Water)
Scheme ID: 20097536 Name of Scheme: SATO PEET No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2550 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 23-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 520 LPM 23 / 115.35 Sato Peet 25.765715 80.982462
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible pump 530 / 60 Sato Peet 25.765715 80.982462
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 150 / 16 Sato Peet 25.765776 80.982534
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.0226
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 PE 100 180 0.1724
2 HDPE PN-6 PE 100 160 0.200
3 HDPE PN-6 PE 100 140 1.658
4 HDPE PN-6 PE 100 110 1.6676
5 HDPE PN-6 PE 100 90 1.3472
6 HDPE PN-6 PE 100 75 1.8344
7 HDPE PN-6 PE 100 63 1.781
HSC Connection
Sno. Total Nos.
1 509
Other Details
2.61
0.00
2.61
23-Apr-2025
24-Apr-2025