| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097536 | Name of Scheme: SATO PEET | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2550 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 23-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 520 LPM | 23 / 115.35 | Sato Peet | 25.765715 | 80.982462 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP Submersible pump | 530 / 60 | Sato Peet | 25.765715 | 80.982462 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 150 / 16 | Sato Peet | 25.765776 | 80.982534 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.0226 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE 100 | 180 | 0.1724 | |
| 2 | HDPE PN-6 PE 100 | 160 | 0.200 | |
| 3 | HDPE PN-6 PE 100 | 140 | 1.658 | |
| 4 | HDPE PN-6 PE 100 | 110 | 1.6676 | |
| 5 | HDPE PN-6 PE 100 | 90 | 1.3472 | |
| 6 | HDPE PN-6 PE 100 | 75 | 1.8344 | |
| 7 | HDPE PN-6 PE 100 | 63 | 1.781 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 509 |