Project Completion Certificate (Ground Water)
Scheme ID: 20097537 Name of Scheme: SULTANPUR SATO No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1850 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 11-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 390 LPM 18 / 113.35 SULTANPUR SATO 25.766140 80.995253
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible pump 390 LPM / 55 SULTANPUR SATO 25.766140 80.995253
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 125 / 12 SULTANPUR SATO 25.766024 80.995477
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.0105
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6, PE-100 160 0.485
2 HDPE PN-6, PE-100 140 0.400
3 HDPE PN-6, PE-100 125 1.130
4 HDPE PN-6, PE-100 110 0.740
5 HDPE PN-6, PE-100 90 1.065
6 HDPE PN-6, PE-100 75 1.290
7 HDPE PN-6, PE-100 63 1.968
HSC Connection
Sno. Total Nos.
1 362
Other Details
1.77
1.76
1.77
11-Oct-2024
12-Oct-2024