| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097559 | Name of Scheme: ADHAURI JJM SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1270 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Jan-2025 | Actual Date of Completion (Capex): 01-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18 / 93.80 | Adori | 27.658743 | 80.490233 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 280 LPM / 40 Mtr. | Adori | 27.658743 | 80.490233 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 16 Mtr. | Adori | 27.658743 | 80.490233 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.771 | |
| 2 | HDPE | 90 | 0.454 | |
| 3 | HDPE | 110 | 0.796 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 238 |