Project Completion Certificate (Ground Water)
Scheme ID: 20097713 Name of Scheme: GADHI JJM SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1319 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Jan-2025 Actual Date of Completion (Capex): 12-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.06 / 109.35 Gadhi 27.5768 80.7761
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 350 LPM / 42 Mtr. Gadhi 27.5768 80.7761
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 KL / 12 Mtr. Gadhi 27.5768 80.7761
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.160
2 HDPE 75 0.432
3 HDPE 90 0.225
4 HDPE 110 0.066
5 HDPE 140 1.050
HSC Connection
Sno. Total Nos.
1 265
Other Details
1.65
0.00
1.65
10-Oct-2024
23-Nov-2024