| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097720 | Name of Scheme: AJDUPUR | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 2190 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2058 |
| Date of Completion (As per Contract): 15-May-2023 | Actual Date of Completion (Capex): 14-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18/118.38 | Ajdupur | 25.857642" N | 80.945088"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 470 LPM / 60 M | AJDUPUR | 25°.857642 N | 80.945088"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL / 14 M | AJDUPUR | 25°.857642 N | 80.945088"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K,9 | 100 | 0.0163 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 140 | 0.8743 | |
| 2 | HDPE | 125 | .892 | |
| 3 | HDPE | 110 | 1.363 | |
| 4 | HDPE | 90 | .7954 | |
| 5 | HDPE | 75 | 2.2642 | |
| 6 | HDPE | 63 | 2.1503 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 400 |