| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097723 | Name of Scheme: KARIYAMAU & RAMPUR | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 5130 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Mar-2025 | Actual Date of Completion (Capex): 07-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 450 LPM" | 16.00 M / 139.35 M | Kariyamau & Rampur | 25.835995 | 81.021374 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10.00 HP Submersible Pump | 450 LPM / 60 M | Kariyamau & Rampur | 25.835995 | 81.021374 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 150 KL / 18 M | Kariyamau & Rampur | 25.836043 | 81.021245 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 3.0589 | |
| 2 | HDPE PN-6 | 75 | 2.6167 | |
| 3 | HDPE PN-6 | 90 | 2.58 | |
| 4 | HDPE PN-6 | 110 | 2.6612 | |
| 5 | HDPE PN-6 | 125 | 0.7853 | |
| 6 | HDPE PN-6 | 140 | 0.361 | |
| 7 | HDPE PN-6 | 160 | 0.3399 | |
| 8 | HDPE PN-6 | 200 | 3.0124 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 884 |