| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097727 | Name of Scheme: KODARWAR ,TAUARA | No. of Villages: 5 | No. of Habitation Covered: 5 |
| Total Population Covered: 4810 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 14-May-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24.00 M / 112.88 m | KODARWAR TAURA | 25°.7776836"N | 81.2762423"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 400/60 | KODARWAR TAURA | 25°.7776836"N | 81.2762423"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150/16 | KODARWAR TAURA | 25°.7776836"N | 81.2762423"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K,9 | 80 | 0.0076 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 180 | 0.021 | |
| 2 | HDPE | 160 | 0.472 | |
| 3 | HDPE | 125 | 1.147 | |
| 4 | HDPE | 110 | 3.3369 | |
| 5 | HDPE | 90 | 1.2966 | |
| 6 | HDPE | 75 | 2.6412 | |
| 7 | HDPE | 63 | 15.1932 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1015 |