| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097755 | Name of Scheme: SARAI IDRISH & LADLEPUR | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 3020 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2058 |
| Date of Completion (As per Contract): 14-May-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18/69.40 | SARAI IDRISH | 25.84657265 | 81.16440553 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 650/55 | SARAI IDRISH | 25.84657265 | 81.16440553 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT.1 | 200/12 | SARAI IDRISH | 25.84657265 | 81.16440553 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 125 | 0.024 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 180 | 0.212 | |
| 2 | HDPE | 140 | 0.175 | |
| 3 | HDPE | 110 | 0.6811 | |
| 4 | HDPE | 90 | 0.493 | |
| 5 | HDPE | 75 | 0.1236 | |
| 6 | HDPE | 63 | 0.10473 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 517 |