| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097775 | Name of Scheme: BARAICHA | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2360 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2058 |
| Date of Completion (As per Contract): 14-Aug-2023 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18/92.35 | BARICHA | 25°.64999177 N | 81.14952123"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 350/55 | BARICHA | 25°.64999177 N | 81.14952123"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 100/12 | BARICHA | 25°.64999177 N | 81.14952123"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 80 | 0.0165 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.112 | |
| 2 | HDPE | 180 | 0.873 | |
| 3 | HDPE | 160 | 0.502 | |
| 4 | HDPE | 125 | 0.2907 | |
| 5 | HDPE | 110 | 0.059 | |
| 6 | HDPE | 90 | 0.013 | |
| 7 | HDPE | 75 | 0.3051 | |
| 8 | HDPE | 63 | 4.163 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 421 |