Scheme ID: 20097777 Name of Scheme: BARAR,GAZIPUR No. of Villages: 3 No. of Habitation Covered: 17
Total Population Covered: 4970 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 14 M / 65.50m BARAR GAZIPIJR 25'.54392916',N at .0a2277 7 1" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 980 LPM / 60 M BARAR GAZIPIJR 25'.54392916',N at .0a2277 7 1" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 300 KL / 18 M BARAR GAZIPIJR 25'.54392916',N at .0a2277 7 1" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D,I, K-9 150 0.0236
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.472
2 HDPE 180 0.643
3 HDPE 160 1.0722
4 HDPE 125 0.5966
5 HDPE 110 1.4041
6 HDPE 90 1.5503
7 HDPE 75 1.7193
8 HDPE 63 13.3693
HSC Connection
Sno. Total Nos.
1 1011
Other Details
3.73
0.00
3.81
12-Sep-2024
12-Oct-2024