Project Completion Certificate (Ground Water)
Scheme ID: 20097779 Name of Scheme: CHAK SHAHPIRPUR No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2450 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24 M / 96.85m CHAK SHAHPIRPUR 25'.863155" N 81.192343"8
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 550 LPM / 55 M CHAK SHAHPIRPUR 25'.863155" N 81.192343"8
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 150 KL/ 12 M CHAK SHAHPIRPUR 25'.863155" N 81.192343"8
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI. K.9 100 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.544
2 HDPE 180 1.111
3 HDPE 160 0.1156
4 HDPE 125 0.4998
5 HDPE 110 0.5053
6 HDPE 90 0.3273
7 HDPE 75 0.8401
8 HDPE 63 4.6178
HSC Connection
Sno. Total Nos.
1 566
Other Details
2.00
0.00
2.04
12-Jul-2024
12-Aug-2024