| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097782 | Name of Scheme: GAURA | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3260 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-May-2023 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 58.00 M i/129.35 m | GAURA | 25'.80162684" N | 87 .22457 409" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 630/55 | GAURA | 25'.80162684" N | 87 .22457 409" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT.1 | 200/12 | GAURA | 25'.80162684" N | 87 .22457 409" E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.t. K-9 | 125 | 0.01725 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 180 | 0.4267 | |
| 2 | HDPE | 160 | 0.0887 | |
| 3 | HDPE | 125 | 0.3697 | |
| 4 | HDPE | 110 | 0.9455 | |
| 5 | HDPE | 90 | 1.7972 | |
| 6 | HDPE | 75 | 1.1936 | |
| 7 | HDPE | 63 | 6.4388 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 681 |