Project Completion Certificate (Ground Water)
Scheme ID: 20097813 Name of Scheme: GHURI BUJURG No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1840 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Jan-2025 Actual Date of Completion (Capex): 22-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 390 LPM 17 / 154.35 GHURI BUJURG 25.902177 80.990443
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible pump 390 LPM / 55 GHURI BUJURG 25.902177 80.990443
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 100 / 14 GHURI BUJURG 25.902192 80.990372
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 .0115
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE, PN-6, PE-100 200 0.0669
2 HDPE PIPE, PN-6, PE-100 160 0.652
3 HDPE PIPE, PN-6, PE-100 140 1.4136
4 HDPE PIPE, PN-6, PE-100 125 2.0972
5 HDPE PIPE, PN-6, PE-100 110 1.2751
6 HDPE PIPE, PN-6, PE-100 75 1.9047
7 HDPE PIPE, PN-6, PE-100 63 2.4402
HSC Connection
Sno. Total Nos.
1 385
Other Details
2.29
2.29
2.29
07-Feb-2025
08-Feb-2025