| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097813 | Name of Scheme: GHURI BUJURG | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 1840 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 23-Jan-2025 | Actual Date of Completion (Capex): 22-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 390 LPM | 17 / 154.35 | GHURI BUJURG | 25.902177 | 80.990443 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP Submersible pump | 390 LPM / 55 | GHURI BUJURG | 25.902177 | 80.990443 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 100 / 14 | GHURI BUJURG | 25.902192 | 80.990372 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | .0115 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE, PN-6, PE-100 | 200 | 0.0669 | |
| 2 | HDPE PIPE, PN-6, PE-100 | 160 | 0.652 | |
| 3 | HDPE PIPE, PN-6, PE-100 | 140 | 1.4136 | |
| 4 | HDPE PIPE, PN-6, PE-100 | 125 | 2.0972 | |
| 5 | HDPE PIPE, PN-6, PE-100 | 110 | 1.2751 | |
| 6 | HDPE PIPE, PN-6, PE-100 | 75 | 1.9047 | |
| 7 | HDPE PIPE, PN-6, PE-100 | 63 | 2.4402 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 385 |