| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097818 | Name of Scheme: HASIMPUR MADEPUR | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 754 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2059 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 1 | 140 | HASIMPUR MADEPUR | 25.857393333 | 80.945155000001 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 1 | 750 | HASIMPUR MADEPUR | 25.857593333 | 80.945555000001 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 225 KL/14 MTR. | HASIMPUR MADEPUR | 25.857593333 | 80.945555000001 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K,9 | 125 | 0.02026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 180 | 0.171 | |
| 2 | HDPE | 160 | 0.440 | |
| 3 | HDPE | 140 | 1.012 | |
| 4 | HDPE | 125 | 0.968 | |
| 5 | HDPE | 110 | 1.1204 | |
| 6 | HDPE | 90 | 2.916 | |
| 7 | HDPE | 75 | 1.476 | |
| 8 | HDPE | 63 | 5.392 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 785 |