Project Completion Certificate (Ground Water)
Scheme ID: 20097825 Name of Scheme: CHAUKI MOHAMMAD PUR SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2608 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 03-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12M/101m CHAUKI MOHAMMADPUR 27.31355 79.56146
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 250LPM/63M CHAUKI MOHAMMADPUR 27.31355 79.56146
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75KL/16M CHAUKI MOHAMMADPUR 27.31355 79.56146
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.213
2 HDPE 63 3.836
3 HDPE 110 0.486
4 HDPE 125 0.448
5 HDPE 140 0.346
6 HDPE 160 0.919
HSC Connection
Sno. Total Nos.
1 620
Other Details
2.23
2.18
2.23
18-May-2024
19-May-2024