| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097832 | Name of Scheme: SATO JOGA | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 4900 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Oct-2024 | Actual Date of Completion (Capex): 16-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 990 LPM" | 19 M / 137.39 M | Sato Joga | 25.764098 | 80.989708 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 25 HP Submersible Pump | 990 LPM / 60 M | Sato Joga | 25.764098 | 80.989708 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 300 KL / 16 M | Sato Joga | 25.764231 | 80.989548 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 150 | 0.012 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6, PE-100 | 200 | 0.201 | |
| 2 | HDPE PN-6, PE-100 | 180 | 0.432 | |
| 3 | HDPE PN-6, PE-100 | 160 | 0.4802 | |
| 4 | HDPE PN-6, PE-100 | 140 | 1.0945 | |
| 5 | HDPE PN-6, PE-100 | 125 | 1.8617 | |
| 6 | HDPE PN-6, PE-100 | 110 | 2.2512 | |
| 7 | HDPE PN-6, PE-100 | 90 | 3.3814 | |
| 8 | HDPE PN-6, PE-100 | 75 | 3.6673 | |
| 9 | HDPE PN-6, PE-100 | 63 | 3.5079 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1036 |