| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097843 | Name of Scheme: CHANGAULI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1031 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Apr-2023 | Actual Date of Completion (Capex): 25-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 12M/57.120M | CHANGULI | 28.3110689 | 77.6750139 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBBLE | 220LMP/51M | CHANGULI | 28.3110689 | 77.6750139 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 75KL/12M | CHANGULI | 28.3110689 | 77.6750139 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.011 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4592 | |
| 2 | HDPE | 75 | 0.642 | |
| 3 | HDPE | 90 | 0.389 | |
| 4 | HDPE | 110 | 0.326 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 212 |