| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097846 | Name of Scheme: BHATAULI WSS | No. of Villages: 1 | No. of Habitation Covered: 0 |
| Total Population Covered: 2452 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 04-May-2024 | Actual Date of Completion (Capex): 30-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL PIPES | 36/84.05 | BHATAULI | 27.798440° | 78.209463° |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 18.9/48 | BHATAULI | 27.798440° | 78.209463° |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | CONVENTIONAL | 100/12 | BHATAULI | 27.798465° | 78.209588° |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.031 | TW TO ESR |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 140 | 0.3989 | VILLAGE NETWORK |
| 2 | HDPE | 125 | 0.035 | VILLAGE NETWORK |
| 3 | HDPE | 90 | 0.0677 | VILLAGE NETWORK |
| 4 | HDPE | 63 | 2.4650 | VILLAGE NETWORK |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 250 |